Shift handover log

A running log where each shift records what the next one needs to know.

Use it on screen
Shift handover logEach entrySign-offDate, shift and leads.Staffing: absences and cover.🔄
How to use itThe outgoing lead writes the entry in the last 10 minutes of the shift; the incoming lead reads it, asks questions and signs.

Who uses the shift handover log and when

Information gets lost at shift change: a customer waiting for a callback, a machine making a noise, a delivery due. A log keeps it in one place.

Unlike an end-of-shift report, a handover log is a continuous book or file that shows history across shifts.

8 items. Keep it on a tablet, or print a copy for the clipboard.

Each entry

Sign-off

Putting the shift handover log to work

  1. Keep the log at a fixed place or shared file.
  2. Write short, specific lines.
  3. Read it before starting.
  4. Do a short verbal handover too.
  5. Managers review it daily.

A real-world example

At 10 pm, the evening lead at a care home logs that a resident refused dinner, the medication cart lock is sticking and one carer is off tomorrow morning. The night lead reads it, checks on the resident and reports the lock to maintenance.

Why it matters

Handovers are a point where information gets lost, and in care settings a missed detail can affect a resident’s safety. A signed log shows what was passed on and when, which also helps if an incident is reviewed later.

A filled-in shift handover log

Site Pinecrest Assisted Living, Billings MT
Shift Evening to night, Wed Jan 21, 10 pm
Leads Out: Teresa; In: Omar
Staffing Carer Liz off sick tomorrow 6 am; agency cover booked
Residents Mr. H. refused dinner, fluids taken; recheck at 2 am
Equipment Room 14 bed alarm intermittent; maintenance ticket 3381
Sign-off Omar read and signed 10:08 pm

The resident note includes a specific recheck time, so the night lead knows exactly what is expected. The bed alarm fault gives a ticket number so nobody logs it twice.

Where a shift handover log usually goes wrong

When to edit the shift handover log

Hotels and front desksAdd guest requests, late arrivals and VIP notes, plus any room that was moved.
Manufacturing linesAdd run counts, quality holds and machine settings changed during the shift.
Pro tipPut a red mark beside anything that must happen in the first hour of the next shift. It is the first thing the incoming lead will look for.

What people ask about the shift handover log

How is it different from an end-of-shift report?

The log is continuous; the report covers one shift.

Paper or digital?

Either.

Who signs?

Outgoing and incoming leads.

How long to keep it?

Per your record policy.

What should be written in a shift handover log?

Each entry should cover staffing and absences, open tasks with deadlines, customer or patient issues, equipment faults and safety concerns, plus the names of the outgoing and incoming leads. Write facts and specific actions, such as ‘room 12 call bell intermittent, maintenance called 9:40 pm’. The incoming lead signs to show it was read.

How do you make shift handovers faster?

Use the same order every time, so the incoming lead knows where to look, and write the log throughout the shift instead of at the end. Do a short face-to-face check on the top two or three items. Leave routine items out unless they changed.

Related resources

More for the same job

Useful next steps

Less chasing, more doing

Once the shift handover log is in place, the next question is usually about shifts and hours. Book a demo to see how EZTime handles scheduling and time tracking.

General information to adapt to your business. Examples on this page are fictional.