Construction punch list template

List the remaining items at the end of a job, assign them and track them to completion.

Use it on screen
Punch list templateEach itemClose-outNumber.Room or area.📌
How to use itWalk the project with the client, list every open item by location, assign each to a trade with a date, and sign off when all are done.

Where the punch list template fits

The last few percent of a job can drag on for weeks. A clear punch list with owners and dates gets it closed.

Walk the site with the client so the list reflects their expectations, not just yours.

11 items. Complete it digitally or on paper, whichever your team prefers.

Each item

Close-out

How to put it to work

  1. Walk room by room.
  2. Be specific.
  3. Assign one owner per item.
  4. Re-walk to verify.
  5. Get written sign-off.

How a team used the construction punch list

A kitchen remodel punch walk lists 14 items, including a cabinet door rubbing and missing outlet covers. The trades close 12 in three days; the last two need a part, and the client signs off the following week.

What the construction punch list protects you from

The punch list is the agreed record of what remains before substantial completion turns into final completion and final payment. Assigning each item a trade and a due date stops small fixes like trim, covers and fixtures from stalling the release of retainage.

A filled-in construction punch list

Project Bayview Coffee fit-out, San Diego
Item 1, front counter Chipped laminate corner, carpenter, due June 12, open
Item 2, restroom Grab bar screw cover missing, GC, done
Item 3, patio Wall sconce dead, electrician, open
Item 4, back door Closer slams, GC, verified
Client walkthrough June 10 with owner Jill
Close-out 1 of 4 verified; retainage held for 3 items

Item 2 is marked done but not verified, so it still counts as open for retainage until Jill checks it on the next walk.

Where a construction punch list goes wrong

Customizing the construction punch list

Commercial tenant fit-outsWalk with the landlord’s representative too, since lease conditions may add items.
HomebuildersHold a 30-day walk after move-in to catch items that only show with use.
Worth knowingNumber items by room and keep the numbers fixed. Changing numbers mid-list causes confusion between trades.

Substantial completion and the paperwork around it

On projects using AIA contract documents, the general conditions in AIA A201 define substantial completion as the stage when the work is complete enough for the owner to occupy or use it for its intended purpose. The architect often issues AIA Document G704, the Certificate of Substantial Completion, with the punch list attached. That certificate usually fixes the date warranties start and when the remaining items must be finished, so the list attached to it should be complete and specific.

Questions about the punch list template

When is the punch list made?

At substantial completion.

Who attends the walk?

The contractor and client, sometimes the architect.

How long should it take?

As short as possible; set dates.

Does sign-off end warranty?

No, warranty terms continue.

Is a punch list item the same as a warranty claim?

No. A punch item is unfinished or wrong work spotted before handover, while a warranty claim covers a defect that shows up after the owner has accepted the work. Keep them on separate lists so the contractor’s warranty period is not confused with open close-out items.

Can the owner hold back money until the punch list is closed?

Many contracts let the owner keep retainage, or a set amount per open item, until each punch item is verified. Write the held amount on the close-out section so both sides agree what releases it. Check the contract and any state prompt-payment rules for limits.

Keep going

More for the same job

Useful next steps

Know who worked when

Use the punch list template for the record you need today. To see who clocked in, and when, book a demo of EZTime.

General information to adapt to your business. Examples on this page are fictional.