Pre-construction checklist

What to settle before breaking ground: scope, permits, budget, schedule, crews, site setup and communication.

Use it on screen
Pre-construction checklistContract and scopePermits and approvalsBudget and scheduleSite and people📐
How to use itRun through it in the weeks before mobilization, with the project manager, foreman and key subcontractors.

Who needs a pre-construction checklist

Many project problems start before the first day on site: unclear scope, late permits or a schedule that does not match available crews.

Permit and inspection requirements depend on the jurisdiction. Confirm them early.

16 items. Keep it on a tablet, or print a copy for the clipboard.

Contract and scope

Permits and approvals

Budget and schedule

Site and people

Putting the pre-construction checklist to work

  1. Hold a pre-construction meeting.
  2. Assign an owner to each item.
  3. Track long-lead items weekly.
  4. Share the schedule with all trades.
  5. Review the list at mobilization.

The pre-construction checklist in practice

A contractor building a small retail fit-out holds a pre-construction meeting two weeks before start. They discover that the storefront glass has a six-week lead time, reorder the schedule to install it last, and confirm crews will clock in on site with a mobile app.

Why keep a pre-construction checklist

Most building departments do not allow work before the permit is issued, and state 811 laws require utility locates before digging. A pre-construction checklist puts these legal steps before mobilization.

A filled-in pre-construction checklist

Contract Signed Oct 20; 2,800 sq ft tenant fit-out
Change orders Written, priced, signed before work
Permits Building permit issued Nov 3; plumbing pending
Long-lead items Dental gas manifold, 8 weeks, ordered Oct 22
Crew hours Framing 160, drywall 220, finish 140
Site access Rear lot, 2 spaces, deliveries before 9 am
Time on site Foreman-signed daily timesheets by phase

Ridgeback Construction is fitting out a dental office in Fort Collins. Crew hours are estimated by phase so the foreman can compare actual hours each week.

Pitfalls to watch for

Tailor it to how you work

Remodeling contractorsAdd homeowner logistics, such as where they will live and how rooms will be protected.
Public projectsAdd bonds, prevailing wage requirements and reporting rules for the agency.
Worth knowingWalk the site with the foreman before mobilization and decide where materials will be stored. A good storage plan saves hours every day.

Frequently asked questions

When to start?

As soon as the contract is signed.

Who attends the meeting?

PM, foreman, key subs and the client if possible.

What about permits?

Check with your jurisdiction early.

Why plan crew hours?

To compare estimates with actual hours later.

What is a long-lead item in construction?

A long-lead item takes weeks or months to arrive after ordering, such as custom windows, switchgear or special equipment. Identify them in pre-construction and order early. Then build the schedule around their delivery dates.

When do I need to call 811 before digging?

Call 811 before any digging, even for fence posts, to have underground utilities marked. State laws set how many working days’ notice you must give, often two to three. Wait until all utilities have responded before you dig.

Related pages

More for the same job

Useful next steps

Know who worked when

Use the pre-construction checklist for the record you need today. To see who clocked in, and when, book a demo of EZTime.