A longer plan for the first 90 days that goes beyond paperwork.
In the United States every new employee completes Form I-9 to verify identity and work authorization. The employee fills in Section 1 no later than the first day of work, and the employer completes Section 2 within three business days of the start date. A federal W-4 sets withholding, and employers must report new hires to the state, in most cases within 20 days, with some states requiring less time. Put these dates on the checklist with owners next to them.
Day one is paperwork, a tour and an introduction to the schedule and time clock. Day two is training with a buddy. By day five, the employee should have clocked in and out correctly, seen their first schedule and met their manager for a short check-in.
| Day | Focus | Owner |
|---|---|---|
| 1 | Forms, tour, time clock | HR |
| 2 | Shadow a buddy | Team lead |
| 3 | Safety and policies | Manager |
| 5 | Check-in, questions | Manager |
Put the first week’s shifts on the checklist. A new hire should see their schedule before the first day, and the time clock should be set up by then. Include paid training time. Time spent in required orientation is work time.
| By day | What the new supervisor can do | Checked by |
|---|---|---|
| 30 | Run a shift with a senior lead present; approve timecards correctly | Store manager |
| 60 | Build the weekly schedule for one department; handle a customer complaint alone | Store manager |
| 90 | Run any shift alone; train a new hire on opening tasks | Area manager |
Each line is something you can observe, not a feeling. At each checkpoint, sit down for 20 minutes and decide together what still needs practice.
Some training has to happen before the work starts. Under OSHA’s Hazard Communication Standard (29 CFR 1910.1200(h)), employees must be trained on hazardous chemicals in their work area at the time of their initial assignment. Forklift operators need training and an evaluation before driving alone (29 CFR 1910.178(l)). Put these items in week one with a date and a trainer, and keep a record of who attended.
Review these numbers every quarter. A change in the checklist should show up in them within a few months.
EZTime’s HR module has onboarding tracks, digital forms with e-signatures and a digital employee file with expiry reminders, which keeps the paperwork part of this list in one place.
Many teams plan for 30 to 90 days.
Yes, adapt the length.
No. It makes sure each person receives and acknowledges it.
A short chat at the end of the first week, and another at 30 days, catches most early problems.
Required training and orientation are generally working time.
A peer in the same role, not the manager, who works the same shifts for the first few weeks.
Say so clearly, agree two or three specific goals for the next 30 days and check them weekly.
Templates help with consistency. A time and attendance system helps you see who worked when. Book a demo to see how EZTime handles it.