A simple walk-through list to spot common issues before work starts.
OSHA’s construction rules call for fall protection at heights of 6 feet or more, and trenches 5 feet or deeper need a protective system unless they are in stable rock. A daily walk should check edges, guardrails, ladders set at a safe angle and extended above the landing, and trench walls. Record what you saw and the time, even when everything is fine.
An inspection is useful only if issues are fixed. Give each problem an owner and a date: “damaged extension cord at Bay 2, electrician, today”. Mark the form when it is resolved. Over a month the list shows repeating hazards that need a better process, not another reminder.
Inspection time is working time and should have a task code. A daily 15 minute walk by a foreman is 1.25 hours a week. Record it so the cost of safety is visible, and so that it is never the first thing cut when a job runs behind.
The general rule in 29 CFR 1926.20(b)(2) requires frequent and regular inspections of job sites, materials and equipment by competent persons. Several standards set more specific checks:
| What | When | By whom | Rule |
|---|---|---|---|
| Scaffolds | Before each work shift and after anything that could affect them | Competent person | 29 CFR 1926.451(f)(3) |
| Excavations and trenches | Daily before work, and after rain or other hazard-increasing events | Competent person | 29 CFR 1926.651(k) |
| Portable ladders | Periodically and after any event that could damage them | Competent person | 29 CFR 1926.1053(b)(15) |
| Cranes | Each shift, monthly and yearly | Competent and qualified persons | 29 CFR 1926.1412 |
A general walk-through checklist like this one sits on top of those specific inspections. Note on the sheet which specific inspections were done and by whom.
Fictional example: at 6:45 a.m. on a three-story framing job, the foreman finds a missing guardrail section on the second-floor east side, a ladder that does not extend 3 feet above the landing and an extension cord with a cut jacket. The guardrail is fixed before work starts on that floor, the ladder is reset and tied off, and the cord is tagged out and replaced. All three are written down with times and initials, along with the items that passed, such as clear stairs and charged extinguishers.
No. It is a general list. Follow the rules for your trade and location.
A competent, designated person.
A competent person, someone trained to identify hazards and authorized to fix them.
Daily at the start of work for active sites, plus after storms or changes.
Keep them with the job records. Some contracts specify how long.