Equipment downtime log

Record every stop: when, how long, why and what fixed it, to find and remove the biggest causes.

Use it on screen
Downtime logEach stopWeekly reviewMachine or line.Start time.⏸️
How to use itOperators log every stop with a reason code. Each week, total downtime by reason and fix the top causes first.

Where the downtime log fits

Downtime that is not recorded cannot be reduced. A simple log with consistent reason codes is enough to start.

Separate planned stops, like changeovers, from unplanned breakdowns.

12 items. Fill it in on screen or print a copy.

Each stop

Weekly review

Example reason codes

Example reason codes
Field What to write
MECH Mechanical breakdown
MAT Waiting for materials
CHG Changeover
STAFF No operator available
QUAL Quality hold

Putting the downtime log to work

  1. Agree reason codes.
  2. Log every stop over a set length.
  3. Review weekly.
  4. Fix top causes.
  5. Track trend.

A real-world example

A bottling plant’s log shows that 40% of unplanned downtime comes from waiting for materials. A line-side supply schedule cuts that reason by half in a month.

What the equipment downtime log protects you from

Repeating causes of lost production often go unnoticed until stops are written down the same way every time. A log with reason codes and responders turns scattered stops into a ranked list for maintenance and planning to work through.

A filled-in equipment downtime log

Machine Oven 2 conveyor
Start and end 1:12 pm to 1:47 pm
Duration 35 minutes
Planned or unplanned Unplanned
Reason code E-02, drive belt slipping
Action taken Belt tensioned, inspected for wear
Responder Abdul, maintenance

Sample for Cascade Bakery in Tacoma, Washington. The reason code comes from a fixed list, so this stop is counted with every other belt problem in the weekly review, and duration is written out to save a step when minutes are totaled.

Equipment downtime log mistakes

Other versions of the equipment downtime log

Small shops with a few machinesStart with a paper sheet clipped to each machine and move to a spreadsheet once the codes settle.
Multi-line plantsUse the same reason codes on every line so you can compare lines and share fixes.
Quick winBefore the first week, ask operators to guess the top three causes. Comparing their guess with the data after a month starts a useful conversation.

Questions about the downtime log

What counts as downtime?

Any stop over the minimum you set.

Why reason codes?

They make totals comparable.

Should changeovers be logged?

Yes, as planned downtime.

Who logs?

The operator or lead.

Should waiting for maintenance be logged apart from repair time?

Yes, split the stop into time waiting for a responder and time spent fixing it. The split shows whether the answer is faster response, such as a technician on every shift, or better upkeep of the machine itself.

How do I turn the log into a percentage of available time?

Divide total downtime by planned production time for the same period and multiply by 100. For example, 90 minutes of downtime in a 480-minute shift is 18.75% of planned time.

Related resources

More for the same job

Related reading

Less chasing, more doing

Once the downtime log is in place, the next question is usually about shifts and hours. Book a demo to see how EZTime handles scheduling and time tracking.

General information to adapt to your business. Examples on this page are fictional.