How much does it cost to open a restaurant?

A category-by-category breakdown of startup costs, with a worksheet you can fill in with real local quotes.

In shortThe cost to open a restaurant varies enormously with concept, size, location and whether you take over an existing space or build from scratch. The main categories are the lease and deposits, build-out and design, kitchen equipment, furniture and technology, licenses and permits, opening inventory, pre-opening payroll and training, marketing, and working capital to cover losses in the first months. Build your budget from local quotes for each category and add a contingency.

Why there is no single answer

A counter-service cafe in a former restaurant space with equipment in place costs a fraction of a full-service restaurant built from an empty shell. Rent, construction and wage levels differ widely between cities. Rather than relying on national averages, list every cost category, gather real quotes and plan for the unexpected. If you are considering a smaller start, our guide on how to start a food truck business covers a lower-cost route.

Startup cost categories

Restaurant startup costs
Category What it includes
Real estate Security deposit, first months’ rent, broker fees, possibly key money
Build-out and design Construction, plumbing, electrical, ventilation and hood systems, grease trap, restrooms, finishes, architect and designer fees
Kitchen equipment Ranges, ovens, fryers, refrigeration, prep tables, dish machine, smallwares
Front of house Tables, chairs, bar, lighting, decor, tableware, signage
Technology POS system, kitchen display screens, Wi-Fi, music, security cameras, time tracking and scheduling
Licenses and permits Business license, health permit, building permits, certificate of occupancy, liquor license, sign permit
Professional services Attorney, accountant, permit expediter if needed
Opening inventory Food, beverages, alcohol, cleaning and paper supplies
Pre-opening payroll Hiring, training and soft-opening shifts
Marketing Branding, website, signage, launch events, local advertising
Insurance Liability, property, liquor liability, workers’ compensation
Working capital and contingency Cash to cover operating losses and surprises in the first months

Build-out: the biggest variable

Turning a space into a working restaurant can be the largest single cost, especially if you need a new hood and fire suppression system, upgraded electrical service, gas lines, grease traps or accessible restrooms. A “second-generation” space that was already a restaurant can save a great deal, but inspect existing equipment and systems carefully and confirm they meet current codes. Get bids from contractors experienced in restaurants, and ask the landlord about tenant improvement allowances or rent-free periods during construction.

Equipment: buy, lease or used

Size equipment to your menu and expected volume. Oversized equipment wastes money and energy; undersized equipment slows service.

Licenses and permits

Most restaurants need a business license, a food service health permit, building and occupancy permits for the space and permits for signs. Serving alcohol requires a state liquor license, which can be expensive and slow to obtain in some areas, and in some places is limited in number. Staff may need food handler cards, and many areas require a certified food protection manager. Start the permit process early, because delays push back opening and add rent costs. Our restaurant compliance guide and HACCP guide cover ongoing requirements.

Pre-opening labor

Restaurants usually hire and train staff before opening, often with several days of training and soft-opening service. That time is paid working time, and minimum wage, overtime and tip rules apply from the first shift. Budget for managers’ salaries during build-out as well. Our restaurant staffing guide and restaurant job positions help you plan the team, and restaurant payroll basics explains tipped wages and overtime.

Working capital: the cost owners underestimate

Few restaurants are profitable from the first week. You need cash to cover rent, payroll, food purchases and loan payments while sales build. Many advisors suggest holding several months of operating expenses in reserve; the right amount depends on your concept and market. Running out of cash before the business finds its footing is a common reason new restaurants close.

Startup cost worksheet

Fill in with local quotes
Category Quote 1 Quote 2 Budget
Deposits and pre-opening rent
Build-out and design
Kitchen equipment
Furniture, fixtures and decor
Technology
Licenses, permits and professional fees
Opening inventory
Pre-opening payroll and training
Marketing and launch
Insurance
Working capital reserve
Contingency

Add a contingency line for overruns; construction and permitting almost always take longer than planned.

Ongoing costs to plan for

Main operating costs
Cost How to manage it
Food and beverage cost Track with a food cost calculator and adjust menu prices
Labor cost Schedule to sales forecasts; see our restaurant labor cost guide
Rent and occupancy Negotiate lease terms before signing
Utilities Maintain equipment and control energy use
Supplies and repairs Preventive maintenance and supplier comparisons
Marketing Measure what brings customers in

Example: two very different openings

Illustrative comparison (no dollar figures)
Factor Counter-service cafe in a former cafe space Full-service restaurant in a new shell
Build-out Light refresh, existing plumbing and hood Full construction, new hood, plumbing, electrical and restrooms
Equipment Some existing equipment reused Full kitchen and bar package
Licenses Health permit and business license Health, building, occupancy and liquor licenses
Staff before opening Small team, short training Full front and back of house team, longer training
Time to open Weeks to a few months Often many months
Working capital Lower monthly costs to cover Higher rent and payroll to cover while sales build

The comparison shows why it is more useful to understand the drivers of cost than to rely on a single average. Use it to decide which concept and space match your budget.

Questions to ask before signing a lease

Timeline and cost of delays

Every month between signing a lease and opening the doors usually costs rent, loan payments and management salaries without any sales. Map the timeline for design, permits, construction, equipment delivery, inspections, hiring and training, and identify which steps depend on others. Ordering long-lead equipment early and starting permit applications as soon as possible can save significant money.

Ways to reduce opening costs

Funding options

Lenders and investors will expect a business plan with detailed cost estimates and financial projections.

Controlling labor from day one with EZTime

Labor is one of the largest ongoing costs in a restaurant. EZTime helps new restaurants control it from the first shift: scheduling software builds shifts around expected covers, the attendance clock records punches and breaks on a shared tablet or phone, and approved hours export to payroll. See EZTime for restaurants.

Frequently asked questions

How much does it cost to open a restaurant?

It varies widely by concept, size, location and the condition of the space. Build a budget from local quotes for each cost category plus working capital and a contingency.

What is the biggest cost when opening a restaurant?

Build-out of the space and kitchen equipment are often the largest one-time costs, followed by working capital needs.

Can I open a restaurant with less money?

Options include a second-generation space, a smaller menu, used equipment, phased opening or starting with a food truck.

How much working capital does a new restaurant need?

Enough to cover operating costs while sales build; many advisors suggest several months of expenses in reserve.

Do I need to pay staff during training before opening?

Yes. Training and soft-opening shifts are paid working time, and wage and hour rules apply.

How long does it take to get restaurant permits?

It depends on your location and whether you need a liquor license. Start early, because delays add rent costs.

Should I buy an existing restaurant instead?

Buying an operating restaurant can lower build-out costs and speed up opening, but review its finances, lease, equipment and reputation carefully.

Where to go next

Keep reading

Track meal and rest breaks

Breaks are recorded in EZTime alongside the shift, with reminders for employees and an alert when a required break is skipped.

Disclaimer: This guide is general information only and is not legal, financial or tax advice. Costs and requirements vary widely by location and concept. Consult qualified professionals and obtain local quotes before opening.